Boy oh boy. Where do I begin?

 

The entire house has been painted inside. Hardwood floor wood should be delivered this week. The floor has been leveled to prepare it for the hardwood installation. All the doors have been ordered. We have lights up and working in the living room, bedrooms, master closet, and over the shower. Our bathroom vanity is in the garage along with our bathroom cabinet. The rest of the bathroom fixtures have been ordered. The tile has be laid and grouted in the bathroom.

 

Today, I believe Jay wants to do another coat on the kitchen ceiling. The kitchen looks amazing by the way. Bright white pain makes a huge difference. He might also put the sealer on the bathroom tile.

 

So much progress in so little time. Thank you Joe, Brian, Bill, Randi, June, Shara, and Jim for all of your time and hard work!!!